Arriving at the job.
All necessary materials are gathered for the job.
Damage
Three ceiling patches needed.
Drop cloth
Drop cloth is laid from the entrance to the worksite.
Drop cloth continued...
Drop cloth is laid from the entrance to the jobsite.
Containment
Plastic is used to contain the job site.
Continued...
Plastic hangs ceiling to floor.
Measurements
Tech takes measurements for the size of drywall needed for the patch.
Drywall patch
The patch covers the damage area.
Securing the patch.
Tech secures the drywall.
Tape
Fiberglass tape is laid over the edges of the drywall patch.
Mud
Mud covers the damage area.
Containment
Preparing to spray texture by thoroughly covering rooms contents.
Containment....
Plastic is secured with adhesive spray.
Texture
Texture is sprayed.
Knockdown
Tech knocks down the texture.
Paint
The ceiling in painted.
Finished product!
The ceiling patches blend seamlessly to the rest of the ceiling!