Damage
The initial damage that we came to repair. This damage was caused during a plumbing repair.
Cleanliness
The contents of the room and the floor are all covered to protect against dust or debris.
Prime
This customer wanted the area repainted to match the rest of the room, so once the damage is repaired, we then prime the area for painting.
Paint Prep
The entire wall that the damage is on is then taped and prepared for our corner to corner paint matching.
Final Product
Once the paint is dry, the technician cleans up the floor covering and the job is complete.